Buy 29405-00131 PUMP ASSY, SUPPLY Denso Cross


Rating:
48
Buy PUMP ASSY, SUPPLY 29405-00131 genuine, new aftermarket engine parts with delivery

Information pump assy, supply Denso

Compare Prices: .

As an associate, we earn commssions on qualifying purchases through the links below
$820.00
 

08 Aug 2024

CN: LSSOCH
LSSOCH Fuel Injection Pump 22100-E0020 294050-0130 294050-0137 294050-0318 22100-E0025 Compatible With Kobelco SK300-8 SK330-8 SK350-8 Hino 500 SERIES J08E Engine Excavator
LSSOCH Product Name: Fuel Injection Pump || art Number: 294050-0130, 294050-0131, 22100-E0020, 22100-E0025, VH22100E0020, 294050-0138 || Application Models: Compatible with Kobelco SK300-8 SK330-8 SK350-8 Hino 500 SERIES J08E Engine Excavator || Package Includes: 1X Fuel Injection Pump,294050-0131, 22100-E0020
$615.90
 

14 Jul 2024

CN: SINOCMP Excavator Pa
SINOCMP 22100-E0020 294050-0130 294050-0131 Fuel Pump for Kobelco SK330-8 SK350-8 HINO 500 SERIES J08E Engine Aftermarket Parts
SINOCMP 【Accurate】installation and use our excavator parts. Please find the suitable product based on the old part number and machine model. || 【Scientific】products pass professional testing and inspection. Not sure what the construction machinery product will do? The adaptable products, safe using operation and easy installation. || 【Use】construction machinery product must be in accordance with operating procedures to avoid accidents. We will provide matching product usage guidance and professional product operation suggestions. || 【Key】construction machinery equipment meaning of existence? It is to bring convenience to life. In order to avoid the trouble of frequent replacement, strictly require product quality and improve service life.
$450.00
 

14 Jul 2024

CN: QJ-Space Parts
HESIEU 294050-0130 294050-0131 22100-E0020 Fuel Injection Pump compatible with Hino J08E Engine w/Kobelco SK300-8 SK330-8 SK350-8
HESIEU 🎶Replace Part Number: 294050-0130, 294050-0131, 22100-E0020, 22100-E0025, VH22100E0020, 294050-0138 || 🎶 Application fis for: For Hino J08E Engine || 🎶Application fis for: For Hino J08E Kobelco SK300-8 SK330-8 SK350-8 || 🎶Warranty: 1 Year (Please feel free to let us know if you have any further questions. Thanks!!) || 🎶 Please confirm your machine model before payment, and if you are not sure about your machine model, please fell free to contact us, we will guide you free of charge!!!!

Include in ##:

Number on scheme 000
PUMP ASSY, SUPPLY
29405-00133 as PUMP ASSY, SUPPLY

Cross reference number



Part num
Firm num
Firm
Name
29405-00131 
22100-E002 
PUMP ASSY, SUPPLY




Information:

Daily
Walk-Around Inspection - Inspect for leaks and loose connections Engine Crankcase - Check oil level Cooling System - Check coolant level Air Cleaner Indicator - Test Air Starting Motor (If Equipped) - Check/fill oiler bowlEvery 18 950 L (5000 gal) of Fuel or 125 Hours*
Scheduled Oil Sampling (S O S) Analysis - Obtain sample Engine Oil & Filters - Change oil and oil filter(s) Fuel System - Drain water/sediment Cooling System - Test Crankcase Breathers - Clean Engine Valve Lash (At First Oil Change Only) - Check/AdjustEvery 37 900 L (10,000 gal) of Fuel or 250 Hours*
Batteries - Clean/Check electrolyte level Belts, Hoses and Clamps - Inspect/Replace if necessary Engine Air Cleaners - Replace Engine Speed Sensors - Inspect/clean magnetic pick-upEvery 151 600 L (40,000 gal) of Fuel or 1000 Hours*
Engine Protection Devices - Inspect for proper operation (Check at least twice per year) Engine Valve Lash - Check/Adjust Turbochargers - Inspect for proper operation Engine Mounts and Crankshaft Vibration Damper - Inspect/checkEvery 341 100 L (90,000 gal) of Fuel or 2250 Hours*
Connecting Rod Bearings - ReplaceEvery 454 800 L (120,000 gal) of Fuel or 3000 Hours or Two Years*
Cooling System - Clean/Flush/replace thermostats and gasketsOverhaul Every 511 650 L (135,000 gal) of Fuel or 5400 Hours*
To minimize downtime and provide you with the lowest cost and highest value, Caterpillar recommends that the engine be overhauled before failure by scheduling an overhaul with your Caterpillar dealer. Refer to the Overhaul section in this manual on page 85. Top End Overhaul After Failure Overhaul Starting Motor - Inspect for proper operation Alternator - Inspect for proper operation Engine Speed Sensors - Inspect/clean/test*First Perform Previous Service Hour Items Caterpillar suggests that fuel consumption be used as the preferred method of determining maintenance intervals. Fuel consumption/hours will vary depending on the proper application of your engine rating and adherence to recommended maintenance procedures.

Have questions with 29405-00131?





Group cross 29405-00131

Back to top