Rating:
Information pump assy, supply Denso
Compare Prices: .
As an associate, we earn commssions on qualifying purchases through the links below
INJECTION Fuel Pump 294000-0580 8-97386558-0 294000-0581 8-97386558-1
LCQBXGPU Long lifespan, stable and durable || Enhance power and solve oil leakage || Smooth start-up and improved fuel consumption || Excellent raw materials and advanced technology || INJECTION Fuel Pump 294000-0580 8-97386558-0 294000-0581 8-97386558-1
LCQBXGPU Long lifespan, stable and durable || Enhance power and solve oil leakage || Smooth start-up and improved fuel consumption || Excellent raw materials and advanced technology || INJECTION Fuel Pump 294000-0580 8-97386558-0 294000-0581 8-97386558-1
HP3 Fuel Injection Pump Diesel Fuel Pump Diesel Injection 294000-0580 294000-0581 8-97386558-0 Compatible For ISUZU 4HK1
LCQBXGPU Long lifespan, stable and durable || Enhance power and solve oil leakage || Smooth start-up and improved fuel consumption || Excellent raw materials and advanced technology || HP3 Fuel Injection Pump Diesel Fuel Pump Diesel Injection 294000-0580 294000-0581 8-97386558-0 Compatible For ISUZU 4HK1
LCQBXGPU Long lifespan, stable and durable || Enhance power and solve oil leakage || Smooth start-up and improved fuel consumption || Excellent raw materials and advanced technology || HP3 Fuel Injection Pump Diesel Fuel Pump Diesel Injection 294000-0580 294000-0581 8-97386558-0 Compatible For ISUZU 4HK1
Fuel Injection Pump Compatible With Isuzu 4HK1 Engine Truck 8-97386558-1 294000-0580 294000-0581 Excavator Replacement Parts
HZMehi Easy installation: reasonable design, easy to install and replace. || Automatic regulation: Automatically adjusts fuel pressure according to engine requirements. || Cold start performance: It can still work normally under low temperature conditions. || Easy to debug: Provide convenient debugging methods for maintenance personnel. || Durability test: After a long time durability test.
HZMehi Easy installation: reasonable design, easy to install and replace. || Automatic regulation: Automatically adjusts fuel pressure according to engine requirements. || Cold start performance: It can still work normally under low temperature conditions. || Easy to debug: Provide convenient debugging methods for maintenance personnel. || Durability test: After a long time durability test.
Components :
Scheme #.#:
№
Qty
Part num
Name
Remarks
Manufacture num
000
[01]
29400-00581
PUMP ASSY, SUPPLY
HP3
0711-
8-97386558-1
ISUZU
Include in ##:
29400-00581
as PUMP ASSY, SUPPLY
Cross reference number
Part num
Firm num
Firm
Name
29400-00581
8-97386558
PUMP ASSY, SUPPLY
Information:
1. Remove bolt (1) from the alternator and bracket. 2. Remove the two bolts that hold bracket (3) to the timing gear cover.3. Disconnect water line (2) from the air compressor. 4. Remove bolts (4) and (5) that hold the cylinder head to the cylinder block. 5. Fasten a hoist and remove cylinder head (6). The weight is approximately 300 lb. (135 kg).
Do not put the cylinder head down on a flat surface. This can cause damage to the fuel injection valves.
6. Remove the seals from the spacer plate.Install Cylinder Head Assembly
Be sure a new gasket has been installed between the spacer plate and the cylinder block. See REMOVE AND INSTALL SPACER PLATE. 1. Thoroughly clean the spacer plate and the bottom surface of the cylinder head. Install a new head gasket and new seals (1). Later model engines have two O-ring seals on top and bottom of the spacer plate. 2. Fasten a hoist and put cylinder head (2) in position on the cylinder block. 3. Put clean engine oil on the threads of the cylinder head bolts. Install the cylinder head bolts and washers. Tighten the bolts in sequence shown in illustration A87019x1: a) Tighten bolts 1 through 20 in number sequence to a torque of 200 20 lb.ft. (270 25 N m).b) Tighten bolts 1 through 20 in number sequence to a torque of 330 15 lb.ft. (450 20 N m).c) Tighten bolts 1 through 20 in number sequence to a torque of 330 15 lb.ft. (450 20 N m) by hand.d) Install rocker shafts and push rods. See INSTALL ROCKER SHAFTS AND PUSH RODS.e) Tighten bolts 21 through 26 in number sequence to a torque of 200 20 lb.ft. (270 25 N m).f) Tighten bolts 21 through 26 in number sequence to a torque of 330 15 lb.ft. (450 20 N m).g) Tighten bolts 21 through 26 in number sequence to a torque of 330 15 lb.ft. (450 20 N m) by hand.h) Tighten the 3/8" bolts to a torque of 32 5 lb. ft. (43 7 N m). If the studs for the exhaust manifold were removed, install new studs and tighten to 20 3 lb.ft. (25 4 N m).4. Make a adjustment to the valves to have a clearance of .015 (0.38 mm) for intake and .030 (0.76 mm) for exhaust. Install the valve cover bases and the inner fuel lines. Tighten the locknuts for the valve adjustment screws to a torque of 22 3 lb.ft. (28 4 N m).5. Install the valve cover bases and the inner fuel lines. See INSTALL ROCKER SHAFT AND PUSH RODS.6. Install the valve covers. See INSTALL VALVE COVERS. 7. Connect water line (3) to the air compressor. 8. Install bolt (4) for the alternator.end by:a) install exhaust manifoldb) install fuel injection linesc) install inlet manifoldd) install water temperature regulator
Do not put the cylinder head down on a flat surface. This can cause damage to the fuel injection valves.
6. Remove the seals from the spacer plate.Install Cylinder Head Assembly
Be sure a new gasket has been installed between the spacer plate and the cylinder block. See REMOVE AND INSTALL SPACER PLATE. 1. Thoroughly clean the spacer plate and the bottom surface of the cylinder head. Install a new head gasket and new seals (1). Later model engines have two O-ring seals on top and bottom of the spacer plate. 2. Fasten a hoist and put cylinder head (2) in position on the cylinder block. 3. Put clean engine oil on the threads of the cylinder head bolts. Install the cylinder head bolts and washers. Tighten the bolts in sequence shown in illustration A87019x1: a) Tighten bolts 1 through 20 in number sequence to a torque of 200 20 lb.ft. (270 25 N m).b) Tighten bolts 1 through 20 in number sequence to a torque of 330 15 lb.ft. (450 20 N m).c) Tighten bolts 1 through 20 in number sequence to a torque of 330 15 lb.ft. (450 20 N m) by hand.d) Install rocker shafts and push rods. See INSTALL ROCKER SHAFTS AND PUSH RODS.e) Tighten bolts 21 through 26 in number sequence to a torque of 200 20 lb.ft. (270 25 N m).f) Tighten bolts 21 through 26 in number sequence to a torque of 330 15 lb.ft. (450 20 N m).g) Tighten bolts 21 through 26 in number sequence to a torque of 330 15 lb.ft. (450 20 N m) by hand.h) Tighten the 3/8" bolts to a torque of 32 5 lb. ft. (43 7 N m). If the studs for the exhaust manifold were removed, install new studs and tighten to 20 3 lb.ft. (25 4 N m).4. Make a adjustment to the valves to have a clearance of .015 (0.38 mm) for intake and .030 (0.76 mm) for exhaust. Install the valve cover bases and the inner fuel lines. Tighten the locknuts for the valve adjustment screws to a torque of 22 3 lb.ft. (28 4 N m).5. Install the valve cover bases and the inner fuel lines. See INSTALL ROCKER SHAFT AND PUSH RODS.6. Install the valve covers. See INSTALL VALVE COVERS. 7. Connect water line (3) to the air compressor. 8. Install bolt (4) for the alternator.end by:a) install exhaust manifoldb) install fuel injection linesc) install inlet manifoldd) install water temperature regulator