Rating:
Information pump assy, injecti Denso
Product
Fuel Injection Pump
Vehicle engine
INDUSTRIAL 2Z
Engine
2Z
Serial start-end
9909-
Info
Injector Nozzle
093500-7000
Manufacture:
22100-78715-71 TOYOTA
Dim 1
2.9-3.1
Dim 2
5.2-5.4
Dim 3
0.28-0.38
Dim 4
Dim 5
Dim 6
Information
Injector nozzle:
0935007000
KIT List:
Part name
Kit1
Kit2
Components :
Scheme #.#:
№
Qty
Part num
Name
Remarks
Manufacture num
000
[01]
19600-03830
PUMP ASSY, INJECTI
22100-78715-71
TOYOTA
Include in ##:
19600-03830
as PUMP ASSY, INJECTI
Cross reference number
Part num
Firm num
Firm
Name
19600-03830
22100-7871
PUMP ASSY, INJECTI
1960003830
22100-78715-71
TOYOTA
PUMP ASSY, INJECTI
Information:
3. Remove clamp (4).4. Remove nuts, spacers and brackets (5).5. Remove exhaust manifold (3).6. Remove the gaskets from the exhaust manifold or studs. 7. Separate section (6), sections (7) and section (8).Install Exhaust Manifold
Make sure the 2P-2333 Manifold Sealer does not get on the inside of each manifold. Damage to the turbocharger could be the result if the manifold sealer gets on the impeller on the turbocharger.
1. Apply a thin coat of 2P-2333 Manifold Sealer to the O.D. of male end of the manifold sections (7) and section (8). Coat the female ends of the manifold with clean engine oil.2. Connect sections (6), sections (7) and section (8). 3. Install 5P-3931 Anti-Seize Compound on the threads of studs (9).4. Install the gaskets on the studs. 5. Install exhaust manifold (3).6. Install nuts, spacers and brackets (5). Tighten the nuts to a torque of 38 5 N m (28 4 lb ft).7. Install clamp (4). 8. Install two shields (2) to exhaust manifold (3).9. Using a new O-ring seal at the bottom and a new gasket at the top, install turbocharger return oil line (1).
Make sure the 2P-2333 Manifold Sealer does not get on the inside of each manifold. Damage to the turbocharger could be the result if the manifold sealer gets on the impeller on the turbocharger.
1. Apply a thin coat of 2P-2333 Manifold Sealer to the O.D. of male end of the manifold sections (7) and section (8). Coat the female ends of the manifold with clean engine oil.2. Connect sections (6), sections (7) and section (8). 3. Install 5P-3931 Anti-Seize Compound on the threads of studs (9).4. Install the gaskets on the studs. 5. Install exhaust manifold (3).6. Install nuts, spacers and brackets (5). Tighten the nuts to a torque of 38 5 N m (28 4 lb ft).7. Install clamp (4). 8. Install two shields (2) to exhaust manifold (3).9. Using a new O-ring seal at the bottom and a new gasket at the top, install turbocharger return oil line (1).