19100-05750 PUMP ASSY, INJECTI Calibration Data


Rating:
47
Buy PUMP ASSY, INJECTI 19100-05750 genuine, new aftermarket engine parts with delivery

Information pump assy, injecti Denso

Product
Fuel Injection Pump
Vehicle engine
TRUCK EH700
Engine
EH700
Serial start-end
8805--9204
Info
Injector Nozzle
093500-2080
Injector nozzle: 0935002080

KIT List:

Part name
Kit1
Kit2
Body assy, injecti
Timer assy, automa
Pump assy, fuel fe
Governor assy, mec

Components :

00.001
PUMP ASSY, INJECTI
A6,R722
01.002
BODY ASSY, INJECTI
A6
02.003
COVER, BEARING
DUMMY
01.004
TIMER ASSY, AUTOMA
SA/2SP
01.005
PUMP ASSY, FUEL FE
KE
01.006
COUPLING ASSY
SP
01.007
GOVERNOR ASSY, MEC
R722

Scheme #.#:

Qty
Part num
Name
Remarks
Manufacture num
000
[01]
19100-05750
PUMP ASSY, INJECTI
A6,R722
22010-5410 HINO
004
[01]
VALVE ASSY, OVERFL
1.5-1.8K
22107-1090A HINO
005
[02]
WASHER
T1
22847-1940A HINO
006
[01]
COVER, CONTROL RAC
22114-1160A HINO
007
[06]
BOLT, W/WASHER
M6,L14
22815-1620A HINO
008
[01]
BODY ASSY, INJECTI
A6
22110-1720B HINO
009
[01]
PUMP ASSY, FUEL FE
KE22
22570-1250A HINO
010
[01]
GOVERNOR ASSY, MEC
R722
22310-3950A HINO
011
[01]
BOLT, W/WASHER
M8,L18
22815-2820A HINO
012
[01]
KEY, WOODRUFF
T3.985
22895-1010A HINO
013
[01]
COUPLING ASSY
SP
22610-1080A HINO
014
[01]
NUT, TIMER ROUND
22511-1070A HINO
015
[01]
TIMER ASSY, AUTOMA
SA
22510-1190A HINO
016
[01]
WASHER, SPRING
T3.5
22877-1620A HINO
017
[02]
CAP
FOR MAX.SPEED
22323-1210A HINO
020
[01]
NUT, HEXAGON
M6,L36
92100-6040A HINO
021
[01]
SCREW, CONTROL RAC
22396-1210A HINO
022
[02]
PIN
22358-1010A HINO

Include in ##:

19100-05750 as PUMP ASSY, INJECTI

Cross reference number



Part num
Firm num
Firm
Name
19100-05750 
22010-5410 
PUMP ASSY, INJECTI
1910005750 
22010-5410 
HINO
PUMP ASSY, INJECTI

Test Calibration Data:

1910005750 22010-5410A




Information:

Secure engine in swivelling mounting stand.1. Dismantle the following units and components: Air filter with holder, starter, air compressor with bracket and lubricating oil line, generator with holder, fuel-supply line to the flame-type heater plug or the pipe connecting with the pilot injector, induction manifold, exhaust manifold, cover plate on the exit air side, air cowling, fuel and lubricating oil filters with their supply lines, leak-off and delivery lines, vertical plate on the fly-wheel side, blower, front vertical plate, oil cooler, air cowling, vee-belt idler.
9-13 Immediately fuel line unions are dismantled plug or fit caps on the connecting stubs and pipe ends.Fig. 9-13
9-142. Dismantle the vee-belt pulley for the air compressor, main belt pulley and front cover. (Use retainer for vee-belt pulley, No. 143400).Fig. 9-14 The screw securing the vee-belt pulley has a left-hand thread.
9-153. Disassemble the nut on the fuel-injection pump's driving shaft. (Use the universal device No. 110340 or a 19 mm socket spanner).Fig. 9-15 Important:As from 1975, the hub was modified in the case of rigid drive. (The thread for attachment of tool No. 110340 with sleeve has been omitted). Remove gear-wheel fastening screws. (See Section 7)
9-164. Mount the tool without sleeve if the pump drive has on injection timer. If it has no injection timer mount the tool with sleeve (Universal device No. 110340).Fig. 9-16
9-175. Pull the injection pump drive from the pump shaft. Dismantle the pump and the securing flange.Fig. 9-17
9-186. Dismantle the injectors, upper cover plate, valve covers and rocker arm shaft brackets, remove the push-rods and unscrew the plugs. (Use socket spanner No. 120040, square socket insert No. 120060)Fig. 9-18, left7. Slacken the cylinder head studs in stages, in diagonal sequence. (Use socket spanner No. 120040)Fig. 9-18, right8. Dismantle the cylinder heads and pushrod sheaths.
9-199. Turn engine upside down. Dismantle the sump with sheet-metal partition, crankcase breather and oil strainer. Disassemble the big-end bearing bolts. (Use bent socket spanner No. 131540)Fig. 9-1910. Slacken and remove the big-end bearing caps. Withdraw the cylinders with pistons and connecting rods from the crankcase. Remove the halves of bearing shells and mark them on the back corresponding to the connecting rods with an electric scriber. Make sure that the bearing shells do not get damaged.11. Dismantle the oil pump and idler gear, camshaft and tappets, flywheel and main bearing caps.12. Remove the crankshaft and the halves of bearing shells. Mark the bearing shells on the back corresponding to the crankcase with an electric scriber. Unscrew the plugs, oil feeders and oil injection nozzles from the crankcase. Clean all parts and thouroughly wash out the oilways.
9-20 Remove horizontal oil nozzles. Fig. 9-2013. Check all parts for suitability for reuse.Assembling The Crankshaft Assembly (as from 3 cylinder engine)
It is assumed that the liner is fitted in the front camshaft bearing bore.
9-611. Place the crankcase with the cylinder head joint face downwards. Screw the dosing plugs in the oilways of

Have questions with 19100-05750?





Group cross 19100-05750

Back to top