19100-05620 PUMP ASSY, INJECTI Calibration Data


Rating:
30
Buy PUMP ASSY, INJECTI 19100-05620 genuine, new aftermarket engine parts with delivery

Information pump assy, injecti Denso

Product
Fuel Injection Pump
Vehicle engine
INDUSTRIAL 1Z
Engine
1Z
Serial start-end
8801-
Info
Injector Nozzle
093500-3430
Injector nozzle: 0935003430

KIT List:

Part name
Kit1
Kit2
Body assy, injecti
Body assy, injecti
Pump assy, fuel fe
Governor assy, mec

Components :

00.001
PUMP ASSY, INJECTI
A4,RSV
01.002
BODY ASSY, INJECTI
A4
01.003
BODY ASSY, INJECTI
A4
01.004
PUMP ASSY, FUEL FE
KS
01.005
GOVERNOR ASSY, MEC
RSV

Scheme #.#:

Qty
Part num
Name
Remarks
Manufacture num
000
[01]
19100-05620
PUMP ASSY, INJECTI
A4,RSV
22100-78302-71 TOYOTA
003
[01]
COVER SUB-ASSY, TI
006
[01]
GOVERNOR ASSY, MEC
RSV
007
[01]
PUMP ASSY, FUEL FE
KS
22510-78300-71 TOYOTA
008
[01]
BODY ASSY, INJECTI
A4 -8811
008
[01]
BODY ASSY, INJECTI
A4 8811-
009
[01]
NUT, HEXAGON
M14
010
[01]
WASHER, SPRING
T3.5
011
[01]
KEY, WOODRUFF
T4.023
90099-13018 TOYOTA
013
[01]
COVER, CONTROL RAC
014
[05]
BOLT, W/WASHER
M6,L16
015
[01]
BOLT, W/WASHER
M8,L22
016
[04]
NUT, HEXAGON
M10
017
[04]
WASHER, STEEL PLAT
FOR M10
018
[01]
O-RING
ID74.1
019
[01]
BOLT, W/WASHER
M6,L14

Include in ##:

19100-05620 as PUMP ASSY, INJECTI

Cross reference number



Part num
Firm num
Firm
Name
19100-05620 
22100-7830 
PUMP ASSY, INJECTI
1910005620 
22100-78302-71 
TOYOTA
PUMP ASSY, INJECTI

Test Calibration Data:

1910005620 22100-78302-71




Information:

1. Remove nuts (1), cover (2), and the gasket. 2. Put No. 1 piston at the top center compression position (TC) with the following procedure:a. Remove plug (3), two bolts and cover (2) from the flywheel housing. b. Install Tool (B) in the flywheel housing. Use Tool (B) to slowly rotate the engine in the direction of normal rotation, (counterclockwise as seen from the flywheel end of the engine), until timing bolt (4) can be installed in the flywheel housing and into the hole in the flywheel. c. Remove the valve cover from the valve cover base. Check to see if both rocker arms (5) for the No. 1 cylinder can be moved backward and forward. The No. 1 piston is at the top center compression position (TC) when the timing bolt is installed in the flywheel and both rocker arms for the No. 1 cylinder can be moved backward and forward. If both rocker arms cannot be moved, the No. 1 piston is not at the top center compression position (TC). Remove the timing bolt from the flywheel and rotate the engine in the direction for normal rotation, (counterclockwise as seen from the flywheel end of the engine one full turn 360 degrees, and install the timing bolt again.3. Remove the timing bolt, and use Tool (B) to rotate the engine in the opposite direction of normal rotation (clockwise as seen from the flywheel end of the engine) a minimum of 30 degrees. The timing is correct if Tool (A) and the timing bolt can be installed at the same time. The timing procedure in the Testing & Adjustment Manual must be done again if the timing bolt and Tool (A) can not be installed at the same time.4. Remove the plug from the timing pin hole in the fuel injection pump housing. Install Tool (A) in the timing pin hole. 5. Remove eight bolts (6) and automatic timing advance (7). 6. Remove gear (9) from fuel injection pump camshaft (8).The following steps are for the installation procedure.7. Install gear (9) on fuel injection pump camshaft (8). 8. Install two 3/8 in 16 NC x 6 in (152.4 mm) long guide bolts (10). Space the guide bolts evenly.
There is a light spring located beneath the flyweight cover (12). Hold cover (12) while removing last nut (11). Slowly remove flyweight cover (12) to avoid dropping the spring.
9. Remove four nuts (11) and remove flyweight cover (12). 10. Put automatic timing advance (13) in position on the fuel injection pump camshaft, and install four bolts (14). Tighten bolts (14) just past finger tight. Remove guide bolts (15). 11. Install four nuts (16). Install Tool (C). 12. Tighten four knurled nuts (17) finger tight.
Do not use any tools to tighten the knurled nuts.
13. Install all mounting bolts (14) and tighten to 55 10 N m (41 7 lb ft).14. Loosen knurled nuts (17). Remove four nuts (16) and remove Tool (C).15. Install the spring and flyweight cover

Have questions with 19100-05620?





Group cross 19100-05620

Back to top