29400-90630 OVERHAUL KIT, SUPP Denso Cross


Rating:
36
Buy OVERHAUL KIT, SUPP 29400-90630 genuine, new aftermarket engine parts with delivery

Information overhaul kit, supp Denso

Scheme #.#:

Qty
Part num
Name
Remarks
Manufacture num
000
[01]
29400-90630
OVERHAUL KIT, SUPP
*1
001
[01]
HOUSING SUB-ASSY,
-1106
001
[01]
HOUSING SUB-ASSY,
1107--1605
001
[01]
HOUSING SUB-ASSY,
1606-
003
[01]
CAMSHAFT, SUPPLY P
1104-
004
[1C]
KEY, WOODRUFF
W4.00 -1107
004
[1C]
KEY, WOODRUFF
1104-
006-001
[01]
SEAL, OIL
008
[01]
O-RING, SUPPLY PUM
ID53.7
009
[02]
O-RING, SUPPLY PUM
ID51.2
012
[01]
KEY, FEED PUMP
-1103
012
[01]
KEY, FEED PUMP
1104-
018
[02]
O-RING, SUPPLY PUM
ID5.0
019
[02]
O-RING, SUPPLY PUM
ID28.5
031
[01]
O-RING, DISTRIBUTI
ID9.8
033
[01]
VALVE ASSY, SUCTIO
-1006
033
[01]
VALVE ASSY, SUCTIO
1007-
033-001
[01]
O-RING, VALVE
ID13.0
034
[01]
O-RING, SOLENOID
ID22.8
035
[01]
VALVE SUB-ASSY, RE
-0911
035
[01]
VALVE SUB-ASSY, RE
0911-
035-001
[01]
O-RING, SUPPLY PUM
ID 7.5
035-002
[01]
O-RING, SUPPLY PUM
ID10.5
036
[01]
PIPE, SUPPLY PUMP
038
[01]
PLUG, FILTER
M14L15.3
039
[01]
GASKET, PLUG
ID14.3
040
[01]
FILTER SUB-ASSY
041
[01]
O-RING
ID 6.5
046
[01]
COLLAR, PRESSBOARD
M10,L10
048
[02]
WASHER
T1.4
049
[01]
COLLAR, PRESSBOARD
FOR M14
052
[01]
CAP, VALVE HOLDER
M14
053
[01]
UNION, INJECTION P
INLET 1107-
054
[01]
NIPPLE
OUTLET 1107-
100
[01]
OVERHAUL KIT, SUPP
NAME PLATE -1401
101
[01]
OVERHAUL KIT, SUPP
FILTER KIT

Include in ##:

29400-00612 as OVERHAUL KIT, SUPP
29400-90630 OVERHAUL KIT, SUPP

Cross reference number



Part num
Firm num
Firm
Name
29400-90630 
 
OVERHAUL KIT, SUPP




Information:

2. Remove the cylinder liners with tool (A) as shown.Install Cylinder Liners
1. Clean the cylinder liners and the liner bores in the cylinder block. 2. Install cylinder liners (1) in the block without the O-ring seals or filler band.3. Check the cylinder liner projection as follows: a) Install the 3/4"-16 NF bolts, 3 in. long and the 2F126 Washers of tooling (A) on the cylinder block next to each liner. Tighten the bolts evenly, in four steps: 10 lb.ft. (14 N m), 25 lb.ft. (35 N m) 50 lb.ft. (70 N m) and then turn to 70 lb.ft. (95 N m).b) Put the adapter plate and one plate of tooling (A) on top of the liner and install the remainder of tooling (A). Be sure the bar is in position at the center of the liner. Tighten the bolts evenly, in four steps to a torque of: 5 lb.ft. (7 N m), 15 lb.ft. (20 N m), 25 lb.ft. (35 N m), then to 50 lb.ft. (70 N m).c) Check to be sure the distance from the bottom edge of the bar to the top of the cylinder block is the same on both sides of the liner. d) Check the cylinder liner projection with tooling (B) at four locations around the liner. SPECIAL INSTRUCTION (GMG00623) is included with the tool.e) Liner projection must be .001 to .006 in. (0.03 to 0.15 mm). Measurements on the same liner must not be different by more than .002 in. (0.05 mm). Average measurements between liners next to each other must not be different by more than .002 in. (0.05 mm).The maximum difference in the average projection for all cylinder liners under one cylinder head must ot be more than .004 in. (0.10 mm). If the liner is turned in the bore it can make a difference in the liner projection.f. If the liner projection is not .001 to .006 in. (0.03 to 0.15 mm), check the thickness of the following parts: spacer plate, spacer plate gasket, and cylinder liner flange (3). The thickness of the spacer plate must be .338 .001 in. (8.59 0.03 mm). The thickness of the spacer plate gasket must be .008 .001 in. (0.20 0.03 mm). The thickness of the cylinder liner flange must be .3500 .0008 in. (8.890 0.020 mm). The cylinder liner projection can be changed by the correction of the counterbore in the block to a minimum depth of .030 in. (0.76 mm) with a cylinder block counterboring tool. See SPECIAL INSTRUCTION, Form FM055228. Shims are available for the adjustment of the liner projection. 5. Put a mark on the liner and block so the liner can be installed in the same position from which it was removed.6. Remove tooling (a) and (B). Remove the liner. Install new O-ring seals on the liners. 7. Put liquid soap on the O-ring seals and on the cylinder bores. Put filler band (2) in SAE 30W oil. Then immediately install

Have questions with 29400-90630?





Group cross 29400-90630

Back to top