Buy 09500-05516 INJECTOR ASSY Denso Cross


Rating:
34
Buy INJECTOR ASSY 09500-05516 genuine, new aftermarket engine parts with delivery

Information injector assy Denso

Compare Prices: .

As an associate, we earn commssions on qualifying purchases through the links below
$297.99

08 Dec 2024

VN: Laminee
Diesel Injector 095000-5510 095000-5511 095000-5512 095000-5513 095000-5514 095000-5515 095000-5516 For Isuzu N-Series - (Color: 095000-5514)
Generic Color: 095000-5514
$297.99

08 Dec 2024

VN: Laminee
Diesel Injector 095000-5510 095000-5511 095000-5512 095000-5513 095000-5514 095000-5515 095000-5516 For Isuzu N-Series - (Color: 095000-5512)
Generic Color: 095000-5512
$272.99

01 Jan 2025

VN: Laminee
Diesel Injector 095000-5510 095000-5511 095000-5512 095000-5513 095000-5514 095000-5515 095000-5516 For Isuzu N-Series - (Color: 095000-5515)
Generic Color: 095000-5515

Include in ##:

Number on scheme 000
INJECTOR ASSY
09500-05511 as INJECTOR ASSY

Cross reference number



Part num
Firm num
Firm
Name
09500-05516 
8-97603415 
INJECTOR ASSY




Information:

1. Disconnect pressure line (3). Remove two bolts (2).2. Move fuel ratio control (1) up to disengage the fuel ratio control from the lever assembly in the governor. 3. Remove four O-ring seals (4) and screen assembly (5). The following steps are to install the fuel ratio control.4. Inspect, replace and install the four O-ring seals (4) and the screen assembly (5).5. Put the fuel ratio control (1) in position and engage the fuel ratio control with the lever assembly in the governor.6. Install the bolts that hold the fuel ratio control and connect pressure line (3) to the fuel ratio control (1). See Testing And Adjusting for Fuel Ratio Control Adjustment procedure.Disassemble And Assemble Fuel Ratio Control
Start By:a. remove fuel ratio control
Keep all parts clean from contaminants. Contaminants put into the system may cause rapid wear and shortened component life.
1. Remove the two bolts, and the fuel ratio control. Remove O-ring seal (1). 2. Put tooling (A) in a vise as shown so that the station being used is not over the vise jaw. Place the fuel ratio control over the pins in tooling (A). Remove cover (2) and the gasket.
There is spring force behind cover (3). Hold cover (3) in position, and slowly remove the bolts that hold it to release the spring force.
3. Remove cover (3). 4. Remove nut (5) and stop (6). 5. Remove spring (9), washer (7), and diaphragm (10) from retainer (8). Remove retainer (8) from housing (11). 6. Remove nut (16) from extension (15), and remove the extension from retainer (8). Remove valve (12), spring (13) and O-ring seal (14). 7. Remove spring (18), retainer (17) and spring (19). 8. Remove piston assembly (20). 9. Use tooling (B), and remove snap ring (21) and the wave washers from valve assembly (22). Remove piston assembly (23). Remove seal (24). 10. If necessary, remove stem (26) from valve (25).11. Clean and inspect all parts. Make a replacement of all parts that are worn or damaged. The following steps are to assemble the fuel ratio control.12. Assemble stem (26) to valve (25) using 9S3265 Retaining Compound.13. Put seal (24) on piston (23). Install piston (23) on valve assembly (22).14. Put two wave washers in position on valve (22). Use tooling (B) to install the snap ring on the valve assembly.15. Place housing (4) on tooling (A), and put tooling (C) into the bore of the housing. Lubricate tooling (C) with clean engine oil.16. Put a small amount of clean oil on the seal of the piston assembly, and push piston assembly (23) into position with a smooth swift motion.17. Place spring (9), retainer (17) and spring (19) in position in housing (4).18. Put O-ring seal (14) on extension (15). Put spring (13) and valve (12) in position on the extension.19. Lubricate O-ring seal (14) with clean engine oil. Install extension (15) in retainer (8). Install nut (16).20. Put diaphragm (10), washer (7) and spring (9) in position on retainer (8). Install retainer (8).21.

Have questions with 09500-05516?





Group cross 09500-05516

Back to top