Rating:
Information holder & nozzle se Denso
Product
Nozzle & Nozzle Holder
Vehicle engine
INDUSTRIAL KE55
Engine
KE55
Serial start-end
7608-
Info
Injector Nozzle
Components :
Scheme #.#:
№
Qty
Part num
Name
Remarks
Manufacture num
000
[01]
09350-01650
HOLDER & NOZZLE SE
Include in ##:
09350-01650
as HOLDER & NOZZLE SE
Nozzle Specification:
Parts number
0935001650 MITSUBISHI
Nozzle
0934000010
First opm
11.76-12.74
First op
120-130
Second om
-
Second op
-
Torquen
78.4-98.0
Torque
8-10
Prelift
-
Max lift
Engine
INDUSTRIAL KE55
Information
Cross reference number
Part num
Firm num
Firm
Name
09350-01650
HOLDER & NOZZLE SE
Information:
Turn the engine to top dead center, (TDC), compression stroke for the No. 1 piston.1. Remove bolts (1), cover (2) and the gasket.
Camshaft Timing2. Remove two bolts (3) and carefully remove camshaft retainer (4) with the camshaft from the cylinder block. If necessary, remove camshaft gear (5) from the camshaft with a press. The following steps are for the installation of the camshaft.3. If camshaft gear was removed, use the following procedure to reinstall. Heat camshaft gear (5) to a maximum temperature of 315° C (600° F).4. Align the key in the camshaft with the groove (keyway) in gear (5). Install gear (5) on the camshaft.5. Use 8T2998 Camshaft Lubricant on the lobes and journals of the camshaft.6. Carefully, install the camshaft in the cylinder block, positioning retainer (4) and install bolts (3). When installing camshaft, be sure number one cylinder is at top dead center, (TDC), of compression stroke. Camshaft timing is very important. Cam gear timing mark must line up with idler gear timing mark, as illustrated, when the crankshaft idler gear timing is also aligned. For more information about timing of the engine, refer to Specifications section of this service manual.
Do not over torque bolts (1), damage to the gasket could occur.
7. Position gasket, cover (2) and install bolts (1).End By:a. install front pulley and damperb. install governorc. install side cover and cam followers (if previously removed)d. install push rodse. install rocker arm assemblies
Camshaft Timing2. Remove two bolts (3) and carefully remove camshaft retainer (4) with the camshaft from the cylinder block. If necessary, remove camshaft gear (5) from the camshaft with a press. The following steps are for the installation of the camshaft.3. If camshaft gear was removed, use the following procedure to reinstall. Heat camshaft gear (5) to a maximum temperature of 315° C (600° F).4. Align the key in the camshaft with the groove (keyway) in gear (5). Install gear (5) on the camshaft.5. Use 8T2998 Camshaft Lubricant on the lobes and journals of the camshaft.6. Carefully, install the camshaft in the cylinder block, positioning retainer (4) and install bolts (3). When installing camshaft, be sure number one cylinder is at top dead center, (TDC), of compression stroke. Camshaft timing is very important. Cam gear timing mark must line up with idler gear timing mark, as illustrated, when the crankshaft idler gear timing is also aligned. For more information about timing of the engine, refer to Specifications section of this service manual.
Do not over torque bolts (1), damage to the gasket could occur.
7. Position gasket, cover (2) and install bolts (1).End By:a. install front pulley and damperb. install governorc. install side cover and cam followers (if previously removed)d. install push rodse. install rocker arm assemblies