Buy 09640-01270 HEAD SUB-ASSY, DIS Denso Cross


Rating:
45
Buy HEAD SUB-ASSY, DIS 09640-01270 genuine, new aftermarket engine parts with delivery

Information head sub-assy, dis Denso

Compare Prices: .

As an associate, we earn commssions on qualifying purchases through the links below
$224.97

17 Dec 2024

US: DMP Dependable Machi
Generic VE Pump Rotor Head 4/10R 096400-1270 Fit Intended For Engine 2C-T
Generic spare parts || autoparts || machinery parts || engine parts
$95.16
 

02 Mar 2024

CN: Diesel Injection Par
Cabezales Fuel Injection Pump Head Rotor VE 4/10R 096400-1270 1270 Head and Rotor Fit for Engine 2C-T 096000-5170
Cabezales Manufacturer MFR No.:096400-1270,Stamping No.1270. || Application: Fit for Diesel Engine 2C-T . || More Detail:VE Head Rotor 096400-1270,4 Cylinders,4/10R . || Compatible with Fuel Injection Pump:096000-5170 || Notice:Please Check The No. Before Purchase Firstly,The Number Is Usually Stamped Around Its Body.If You Are Not Sure The No. Or You Have Any Question,Please Do Not Hesitate To Contact Us,We Will Reply You In Time.
$125.00
 

31 Aug 2023

CN: Huaxiaoshuai
dertgmlm New Diesel Fuel Pump Head Rotor VE Pump 096400-1270 22140-6A950 96000-5170 Fits for Nissan
dertgmlm Part Name: Fuel Pump Head || Part number: 0096400-1270 22140-6A950 96000-5170 || Fits for Nissan || Package included: 1 Pieces Fuel Pump Head || Note: Avoid unnecessary returns. Before purchase, please carefully check whether the product model you want to buy matches us. If you don't know, please contact us.

Cross reference number



Part num
Firm num
Firm
Name
09640-01270 
22140-6A59 
HEAD SUB-ASSY, DIS
0964001270 
22140-6A590 
TOYOTA
HEAD SUB-ASSY, DIS
0964001270 
22140-6A590 
TOYOTA
HEAD SUB-ASSY, DIS




Information:

1. Carefully clean crankcase, oil ducts in particulary check for free passage.2. Check walls and bearing webs for cracks.3. Check condition of bearing bores. If wear marks on bearing shells are not noticeable, check bearing bores with precision gauge. Attention:If there are signs of wear on the bearing shells, the line of bearing housings can be reworked to an oversize outside diameter on a line boring machine. It is not permissible to bore out individual bearing pedestals. Refer to Technical Circulars.Checking The Preload
4-14. Fit crankshaft bearing caps, observing the numbering, into the crankcase. Preload and tighten bolts according to instructions.(Fixture No. 101900)Fig. 4-1
4-25. Set precision gauge to the size indicated in the Technical Data, using a micrometer frame (nominal or oversize).Fig. 4-2
4-36. Measure each main bearing bore at the points 1 and 2 in plane "a", then in the same manner in plane "b" offset by 90 degrees, see also Fig. 4-6, in order to determine any contraction, out-of-roundness or conicity.Fig. 4-37. If the recorded values correspond to those specified in the Technical Data, the respective bearing bore is in acceptable condition and the required preload will be obtained when new bearing shells are installed.
4-48. If the recorded bearing bore diameters differ only slightly from the specified values, repeat the measurements with the new bearing shells installed.Fig. 4-49. Insert new bearing shells, mount bearing cap, then preload and tighten up according to instructions.
4-5
4-610. Gauge each bore at points 1 and 2 in the vertical and horizontal positions "a" and "b".Fig. 4-5 and 4-611. If the recordings show that the bearing tolerances are up to 0.020 mm max. above the values specified in the Technical Data, the crankcase is acceptable for further use. Otherwise, it is necessary for the line of bearing housings to be reworked to an oversize outside diameter on a line boring machine. It is not permissible to bore out individual bearing pedestals. Refer to Technical Circulars. Nor is it permissible to restore the required preload by underlaying the bearing shells or by reworking the parting faces of the bearing bores. a) The main bearing shells are made in two halves and supplied in six dimensions, corresponding to the specified undersizes of the journals. No attempt may be made to recondition the shells.
4-7b) Standard and oversize wall thickness "W" should be taken from the specifications.Fig. 4-7
4-812. Measure width of locating bearing journal of the crankshaft.Fig. 4-8
4-913. Assemble the thrust rings on the locating main bearing and calliper the overall width.Fig. 4-914. Measure end clearance. Compare with the values given in the specifications. If necessary, fit new stop rings.Replacing Bearing Bushing (F2L)
4-1015. Remove the radial seal ring from the back end shield.Fig. 4-10
4-1116. If the main bearing journal has not been re-ground and the bearing bushing shows no signs of damage or wear, gauge the bearing bore at two diagonal points.Fig. 4-1117. Compare measured values with the Specification Data. If necessary, fit new bearing bushing.
4-1218. Draw the bearing bushing in flush, with its oilholes in register with

Have questions with 09640-01270?





Group cross 09640-01270

Back to top